Sheet
W-01
Base
Ormond Beach, FL
Grid
29.29° N · 81.06° W

Cedar Column Wraps, American Legion Post 267

Ormond Beach

Hand-built 12-stave cedar wraps fitted around the existing 6×6 porch posts, then sanded and painted to match.

Get a free quote for a job like this
  1. 01 — The craft

    Each wrap was glued up in two halves of six true 2×3 cedar staves, 8 feet long, with a 15° bevel cut on each side on the table saw.

  2. 02 — The craft

    Each half was trued with a power planer before the halves were joined.

  3. 03 — The craft

    Twelve beveled staves close into a hollow round wrap, glued with Titebond III.

  4. 04 — The crew

    A finished column wrap on its way to the porch.

  5. 05 — The fit

    The wraps fitted around the existing posts and ratchet-strapped tight while the glue cures.

  6. 06 — The fit

    Straps run the full height of the wrap so every glue joint stays tight until it cures.

  7. 07 — The finish

    Sanding the column wraps smooth in place.

  8. 08 — The finish

    Painting the column wraps white to match the building.

  9. 09 — The finish

    A finished cedar column wrap around the existing porch post.

Your project

Want work like this?

Get a free quote